Painting Job Costing Calculator: Estimated vs Actual

Creating an estimate is not the same as knowing what a job made. Enter what you estimated and what really happened to see the margin you kept and how to fix your next bid.

By , CEO of Majotek. Last reviewed . Free, no signup. How we get our numbers

The job

Estimated

Actual

Estimated gross margin
47.5%
$950 profit planned
Actual gross margin
35.6%
$713 profit made
Profit lost vs estimate
$238
Labor $188 · materials $30 · other $20

The crew took 25% more hours than estimated. To bid the next similar job on what really happened, multiply your production rates by 0.8.

Worked example

A $2,000 job was estimated at 24 painter-hours and $300 of materials, with labor costing $31.25 an hour loaded. That planned a 47.5% gross margin. The crew took 30 hours and spent $330 on paint plus $20 on extra supplies, so the real margin was 35.6%: $237.50 of profit lost, $187.50 of it labor. The speed factor is 0.80, so the next similar job should be bid at 80% of the old production rates.

A simple job costing routine

  1. Estimate with production rates, not a flat price per square foot.
  2. Log painter-hours per job every day, and keep material receipts with the job name.
  3. Within a week of finishing, compare estimated and actual here.
  4. Update your rates with the production rate calibrator once a pattern repeats.

Frequently asked questions

+What is job costing for painters?

Recording what a job really cost — painter-hours, materials and other direct costs — and comparing it with the estimate. It shows the margin you actually made and where the money went.

+Isn't a spreadsheet enough?

A spreadsheet works if you fill it in after every job. The point is the habit: log hours per job, compare with the estimate, and feed the difference back into your production rates.

+What usually causes the gap between estimate and actual?

Labor, almost always: prep that took longer than expected, slower production on detailed trim, extra coats for color changes, and setup and cleanup that were never estimated. Materials are usually a smaller share of the miss.

+How do I use the speed factor?

If the crew took 25% more hours than planned, the factor is 0.8. Multiply your production rates by it for the next similar job. Average several jobs before making a permanent change.